METHOD STATEMENT
CABLE CABLE TRAY INSTA INSTALLAT LLATIO ION N
CONTENTS 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 STAFF IN CHARGE 4.0 EQUIPMENT 5.0 MATERIAL FOR CABLE TRAY INSTALLATION 6.0 DESCRIPTION OF WORK METHOD .0 ORGANI!ATION OF MANPOWER ".0 HEALTH AND SAFETY #.0 SUPPORTING DOCUMENTS
1.0 SCOPE This procedure outlines the methods to be followed for the installation of cable tray.
2.0 REFERENCE DOCUMENTS
Construction Quality Plan Doc ref………………… Doc ref. ……………… Field Materials Control Procedure Field Inspection Test Plan for Elect. Doc ref. …………………. perational Procedure !"cceptance# $tora%e# &andlin% and Preser'ation of Materials in the (ob site. Doc ref. ………………… perational Procedure !(ob $ite perations Mana%ement) Doc ref. …………………..
3.0 STAFF IN CHARGE $ite Mana%er Construction Mana%er Material Control En%ineer Field En%ineer &$E Pro*ect+In+Char%e
Mr !to be fill up) Mr !to be fill up) Mr !to be fill up) Mr !to be fill up) Mr !to be fill up)
4.0 EQUIPMENT In %eneral the main e,uipment to be used for the erection are listed below o o o o
/ / / /
Crane 00T Capacity Trailer 1 2oom Truc3 4eldin% Machine Transpallet
5.0 MATERIAL CABLE TRAY INSTALLATION "s per attached Pro*ect $chedule and Pro*ect Drawin%s Pertainin% to the Electrical $cope.
6.0 DESCRIPTION OF WORK METHOD The wor3 method to install the abo'e mentioned Cable Tray shall be in the followin% se,uence. A. •
• • • • •
•
•
P$%&I'()*++*),-' C%/(
5erification of Cable Tray installation from rele'ant "ppro'ed for Construction Drawin%s. Chec3 if drawin%s are of current re'ised status. $ite released for Cable Tray Installation. Conform if area is ready for installation or wor3able. 6ayout of e7act location of cable tray installation should be determined. 8e'iew Construction Drawin%s for %eneral notes1details and familiari9e the installation method recommended by the Client. E7posed areas for erection shall be cordoned by means of ha9ard identifyin% tape 1 barricade. Confirm that all Tools : Tac3les re,uired for installation are a'ailable. "s a minimum the followin% shall be made a'ailable.
$lin%s D+$hac3les Pulley 4eldin% Machine "brasi'e Cuttin% Machine Drill Machine ;rindin% Machine Electrician Tool2o7 • •
2.
Chec3 ade,uate place for . ?. =. 0. @. A.
Earin% protection# Ear Muff or Plu%s &elmet# &ard+&at &and ;lo'es !6eather or Cotton) Face $hield !for %rindin%1cuttin% acti'ities) Dust Mas3 respiratory protection. $afety ;lassses $afety $hoes
B.
8eflectori9ed 5est !if re,uired)
Items of personal use shall be inspected re%ularly and maintained in ser'iceable and sanitary condition and before reissuin% to another person or returned to stora%e shall be cleaned# disinfected# inspected# and repaired. Employees shall wear clothin% suitable for weather and wor3 conditions.
#.0 SUPPORTING DOCUMENTS A.
P$->%/) D$*,'<(
Electrical cable tray 6ayouts. Cable tray support Details. $pecifications and $tandards re,uired by Client.
2.
T9,/*+ C$*'% P-(,),-' *' O&L-*,'< L-/*),-'
C.
W-$ P%$,)( &ot 4or3 Permit
D.
P+*''% S/%+% - A/),?,),%(